Increased Efficiency: Productivity Increased by 300 Percent

Challenge

A $1B global provider of broadband satellite services and products was manually erecting and sealing cardboard boxes containing electronic equipment at their Maryland facility. As the company’s production volume increased, the number of employees required to ship the products grew and labor costs increased.

Solution

When we saw the increase in demand, we recommended a case erector that could assemble boxes quickly and consistently. We performed a formal ROI analysis to determine the payback and the case erector was a clear solution.

Results

This customer was able to redeploy three employees working three shifts per day and replace them with a single machine operator per shift. By eliminating six positions at an annual burdened labor rate of $35,000, the payback on the purchase was realized in 2.28 months.

Related Solution

Increased Productivity

Productivity is the key to profitability. That is, the ability to
manufacture or produce the most amount of product with
the fewest amount of man hours.

Increase Productivity

Employees Slashed from Nine to Three